Aytekin-Serol Engineering Construction and Trade Co. Ltd.
üst
History Vision and Mission Organization Structure Company Organization Certificates List of affiliates and
 Business partners
Amerikan Hava
 Kuvvetleri İşleri
SABER Projeleri TUSEG İşleri AAFES Projeleri Avrupa Birliği İşleri Bayındırlık İşleri Yakıt İşleri Projelendirme Hizmeti Otomasyon Sistemleri Alçak Gerilim İşleri Özel Sektör Taahütleri Yap-Sat Doğaya Zararlı Madde
Sökümü ve İmhası
Personal Institutional
Projects From the Customers
Home | TR | EN

Projects

AMC PASSENGER TERMINAL - INCIRLIK AB, ADANA/TURKIYE

Contract No : F61358-02-C-0027
Project No : LJYC.00-1023 A/B
Project Title : CNS ADD / RPR AMC Passenger Terminal
Completion Date : August 2004
Contract Amount : 597,517.70 USD
Brief Description : New concrete facility app 950sm with waiting areas, admin offices, passport control desks, lost/found room and baggage conveyor system, new generator w ATS, roof top HVAC equipment w duct system. And also automatic sliding doors c/w breakaway feature, gypsum board suspended ceiling including lighting pool over the luggage area and %90 humidity resistant suspended ceiling in the Office areas has been installed.

Whole facility floors cover with granite ceramic floor tiles all over the building including restrooms. New chain link fence and space frame system for baggage car waiting area was in the scope of the project.

There were no accidents or performance delays have been recorded for this project.
  • AMC PASSENGER TERMINAL
  • AMC PASSENGER TERMINAL
  • AMC PASSENGER TERMINAL
  • AMC PASSENGER TERMINAL

AMC WAREHOUSE - INCIRLIK AB, ADANA/TURKIYE

Contract No : F61358-03-C-0020
Project No : LJYC.00-1025
Project Title : CNS AMC WAREHOUSE
Completion Date : January 2005
Contract Amount : 207,672.57 USD
Brief Description : New metal sandwich siding panel with 3ea high speed roll up door installation has been completed.

The scope of the project includes New pump room design/CNS c/w all related mechanical equipment such as fire pump, jockey pump and vs. valves.

Inside the warehouse new sprinkler system design/installation process has been completed and also, for CLASS 4 FLAMMABLES new HAZMAT ROOM design/construction c/w ANSUL type sprinkler system installation w 2h rated fire proof roll up door has been completed.

There were no accidents or delays have been recorded for this project.
  • AMC WAREHOUSE
  • AMC WAREHOUSE

BASE CHAPEL - INCIRLIK AB, ADANA/TURKIYE

Contract No : F61358-99-C-0006
Project No : LJYC.00-1025
Project Title : Construct / Addition to Base Chapel
Completion Date : August 2002
Contract Amount : 635,734.03 USD
Brief Description : For this project the scope of the work was mainly the renovation for whole facility from the bottom to the top except foundation.

New HVAC including duct work and automation system, new office areas, pray room c/w furniture, laminated wooden doors for office areas, new WC areas, new kitchenette, meeting room with projection and surround system was the main architectural and mechanical works for this project.

Also new fire Alarm System w smoke and heat detectors, electrical cabling, lighting w emergency power packs, data and communication lines, outlets has been installed and tested with our certified subcontractors.

For hot water system we install new hot water tank c/w piping and back flow preventer.

There were no accidents or delays have been recorded for this project.
  • BASE CHAPEL
  • BASE CHAPEL
  • BASE CHAPEL
  • BASE CHAPEL

BASE SUPPLY WAREHOUSE and DEPLOYMENT CENTER - BLDG 310
INCIRLIK AB, ADANA/TURKIYE

Contract No : FA5685-04-C-0011
Project No : LJYC.03-1059
Project Title : RPR Base Supply Warehouse, Deployment Center; BLDG 310
Completion Date : May 2006
Contract Amount : 1,345,929.00 USD
Brief Description : Complete renovation for app 4000sqm steel structure almost 50 years old hangar.

The major works for this project was replacing all existing siding panels with new sandwich type panels, installation of 3 ea roll up doors, paint work for trusses and roof covering, new one floor steel structure and two floor concrete office areas c/w showers, rest rooms, kitchenette, AAFES and office areas w carpet floor tiles and %90 humidity resistant suspended ceiling systems.

Laminated sliding and folding partitions has been installed to separate waiting areas, epoxy floor covering has been applied for the registration areas.

New 7000 lt double layer steel fuel tank w concrete pad and fencing has been installed.

All electrical, communication, lighting w emergency power pack, radio transceiver to communicate the facility with Fire Department, hot water tank with steel piping through fuel tank, fire sprinkler system design and equipment installation, new generator system w ATS has been installed properly and tested with our certified crew.

There were no accidents or delays have been recorded for this project.
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310
  • BASE SUPPLY WAREHOUSE - BLDG 310

BULK STORAGE FACILITIES, TANK 1, 2, 3 - INCIRLIK AB, ADANA/TURKIYE

Contract No : F61358-03-C-0019
Project No : LJYC.99-1100
Project Title : RPR Bulk Storage, Tank 1,2,3
Completion Date : July 2006
Contract Amount : 2,730,710.09 USD
Brief Description : The principal features of work was consist of Tank#3 repair including vapor free of tank, abrasive blasting, coating of tank, repairing holes, cracks and damaged surfaces in the tank, replacing pumps and piping, installing safety devices, construction of the pits, replacing control system, installing high level shut system, valves, equipment, exhaust fan, replacing and modifying piping at loop system including pits, electrical works and cathodic protection

The principal features of work was consist of Tank #1 and 2 repair including sludge removal, vapor free of tank, abrasive blasting, coating of tanks, repairing holes, cracks and damaged surfaces in the tank, replacing fuel transfer and sump pumps, replacing fuel piping, installation of pantograph system for truck refueling including flow meter, valve, hose, komlok devices, installation of the receiving lines pump control system, installation of the related equipment, valves, accessories, replacing exhaust fans.

The project was completed 2 months before the completion date and no accidents has been recorded.
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE
  • BULK STORAGE

HODJA INN,BLDG 1081 - INCIRLIK AB, ADANA/TURKIYE

Contract No : F61358-03-D-0006-5024;SABER
Project No : W/O 8958
Project Title : Improve interior finishes for BLDG 1081, Hodja Inn
Completion Date : February 2006
Contract Amount : 71,333.95 USD
Brief Description : Complete renovation for lobby area including front desk and offices. 2 ea bathrooms c/w locker room, waiting saloon, internet area and library was performed.

New ceiling type A/C Unit has been installed.

Also new automatic sliding door w break away feature and complete paint work has been done.

There were no accidents or delays have been recorded for this project.

  • HODJA INN,BLDG 1081
  • HODJA INN,BLDG 1081
  • HODJA INN,BLDG 1081
  • HODJA INN,BLDG 1081
  • HODJA INN,BLDG 1081
All rights reserved © 2006 - 2007 Aytekin-Serol Engineering Construction and Trade Co. Ltd. Privacy Policy | Tems of Use | Design : RSI

info@aytekin-serol.com   |    Address : Reşatbey Mah. 21 Sok 11/1 01120 Seyhan/ADANA - Türkiye Phone : (+90) 322 453 13 43 - DSN: (676)-1225  |    Fax: (+90) 322 457 70 85
All rights reserved © 2006 - 2007 Aytekin-Serol Engineering Construction and Trade Co. Ltd.

E-Mail : info@aytekin-serol.com | Address : Reşatbey Mah. 21 Sok 11/1 01120 Seyhan/ADANA - Türkiye
Phone : (+90) 322 453 13 43 - DSN: (676)-1225 | Fax: (+90) 322 457 70 85