"The purpose of this project is to Design, provide and install to new 3 each combined office containers to accommodate 30 people at Hardstand 19 complete with all necessary LED interior lighting system, new fire alarm system complete with conventional type photoelectric heat-smoke detector with built-in isolated 135°F thermal sensor and integral sounder device, 220 VAC and 9 VDC battery back-up, UL listed, detectors and all associated accessories and devices, cabling and conduit, power panelboard complete with all accessories and 40 kA surge protective device (SPD) for each container units, new communication main cable between existing connection point and new containers complete with all associated accessories IAW 39 CS Premise Wiring Standards (patch panels, outlets, grounding, ventilation fans, etc.) and HVAC system; 6 ea. power inverter split A/C unit (2 ea. split A/C unit for each office container) complete with all necessary equipment, indoor units, outdoor units, refrigerant piping, condense piping/connection, drain pump, individual control unit, insulation and accessories according to new layout plan.
And also new transformer substations will be designed, provided and instaled complete with 400kVA, 10-4.16 kV/0.400-0.208 kV, dual voltage (±2x2.5 tap), copper/copper winding, dry type transformer (ABB or equal) w/cooling fan, CCV type RMU ( 24V Motorized V module, ABB or equal), dual voltage Form 4B type LV panelboard, lighting, W.P. walk –in enclosure, grounding and concrete foundation."
Contract Number : FA5685-15-D-0002-FA568518F0115
Customer: USAF 39 CONS/LGCA
Customer: USAF 39 CONS/LGCA