The purpose of this project is to design, provide and install to extend existing metal storage facilities including the chain link fence line and build a new metal building to store hazardous materials to include flammable and corrosive materials. Also works cover repairing of the existing drainage grating system in front of existing metal Storages c/w designing /providing new storm drainage system c/w catch basins, removing of asbestos materials, installing new fire pump c/w cunstruction new its building and related electrical connections with new panel, providing and installing galvanized sheet metal exhaust air ductwork inside the hazardous material storage building, Installing led type lighting.
Contract Number: FA5685-15-D-0002-FA568518F0161
Customer: USAF39 CONS/ LGCA
Customer: USAF39 CONS/ LGCA