The purpose of this project is to design, provide and install new provide and install 2 each minimum17,856 m3/h exhaust and fresh air fans with EC–VENT room unit, EC – VENT control board and required supports including seismic connections and fire alarm connections, cabling, ducting, humidity control devices and lighting at the building 878 basement floor.
Contract Number: FA5685-15-D-0002FA5685-18-F-0182
Customer: USAF39 CONS/ LGCA
Completion Date: 9 July 2020