The purpose of this project is to design, provide and install new above ground fuel storage tanks for Alternate Command Post building 2209. Works cover demolishing of the existing 2,500 gallons above ground fuel storage tank (AST) from the building basement and the removal of the 280 gallons single walled above ground day tank from the dirty mechanical room, complete with all associated piping, pumps, power and control cabling, panels and filling pit. We also repair wall penetrations, and perform patch up and touch up the walls. We wil provide and install a 317 gallons capacity double walled AST complete with all necessary equipment, piping and accessories.
Contract Number: FA5685-15-D-0002FA5685-18-F-0188
Customer: USAF39 CONS/ LGCA
Completion Date: 21 May 2020